主持的纵向项目: 1.考虑学习效应的重复性项目时间费用权衡优化研究,国家自然科学基金青年项目,2018-2020,20万 2.基于LOB技术的重复性项目调度方法研究,河北省自然科学基金青年项目,2018-2020,3万 3.重复性项目时间费用权衡优化研究,中央高校面上项目,2017-2019,5万 4.资源受限下重复性项目时间费用权衡优化研究,中央高校面上项目,2020-2022,15万 主持的横向项目: 1.考虑区域发展水平的电网投资优化及效益评估技术研究,2019,29.8万 2.适应改革新形势的电网投资多域联合协同优化及动态配置关键技术研究,2020,29万 以第一作或通讯作者发表的主要论文:
- 邹鑫, 王仁锋, 张立辉, 乞建勋. (2021). 计及软逻辑的重复性项目时间费用权衡优化及其约束规划模型研究. 中国管理科学. (CSSCI-B)
- Zou X, Zhang L H, Zhang Q. (2021). Time-cost optimization in repetitive project scheduling with limited resources. Engineering Construction and Architectural Management. (SSCI/SCI)
- Zou X, Wu G C, Zhang Q. (2020). Work continuity constraints in repetitive project scheduling considering soft logic. Engineering Construction and Architectural Management. (SSCI/SCI)
- Zou X, Zhang L H. (2020). A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic. Automation in Construction. (SCI)
- Su Z X, Wei H Y, Zou X*, et al. (2019). Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Journal of Construction Engineering and Management. (SCI)
- Zou X, Zhang Q, Zhang L H. (2018). Modeling and solving the deadline satisfaction problem in line-of-balance scheduling. Journal of Management in Engineering. (SCI)
- 张立辉, 邹鑫*, 黄元生, 乞建勋. (2018). 重复性项目调度模型的时差分析. 中国管理科学. (CSSCI-B)
- Zou X, Zhang L H, Zhang Q. (2018). A Biobjective Optimization Model for Deadline Satisfaction in Line-of- Balance Scheduling with Work Interruptions Consideration. Mathematical Problems in Engineering. (SCI)
- Zou X, Fang S C, Huang Y S, et al. (2017). Mixed-integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration. Journal of Computing in Civil Engineering. (SCI)
- Huang Y S, Zou X*, Zhang L H. (2016). Genetic Algorithm – Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic. Journal of Management in Engineering. (SCI)
|